Case Study: 14″ Extra-wide WEKO-SEAL®

Forty-five feet below a major U.S. interstate sat a 65-foot deep vault containing a complex system of pipes, valves, and infrastructure for drinking water. For years it worked like a well-oiled machine, until it didn’t. One of the 36” L-shape joints of a cast iron, concrete-lined water main suffered a leak. After other contractors tried […]
Case Study: Two 84″ WEKO-SEAL®s

Due to a leaky pipe, a large metropolitan city was losing 12,000 gallons of treated, drinkable water every single day. A fix was needed, and fast. Two other contractors, both previous customers of Miller Pipeline, were called in by the city to rectify the problem. The leak, which presented as a constant geyser visible on […]
Case Study: Quick deployment to the border ends in a lasting solution

By Alisha Adams | Miller Pipeline Numerous companies were recently contracted to work along the United States and Mexico border. While drilling into the ground, one of the contractors damaged the pipeline causing an 11-inch hole in a pipe that supplied water from the United States to Mexico. “This water supply was critical to agricultural […]